1. Access the Asset Page by using Jump to Structure.

    mceclip1.png

  2. Click on the Inspection Tab on the top.

    mceclip0.png

  3. Click on the Select Operation dropdown on the inspection you wish to modify.

    mceclip2.png

  4. Click on the Edit Schedule option.


    mceclip3.png

  5. Make the necessary changes in the Schedule Inspection form.

    mceclip4.png

  6. Click on the Schedule button when finished.