- Access the Asset Page by using Jump to Structure.
- Click on the Inspection Tab on the top.
- Click on the Select Operation dropdown on the inspection you wish to modify.
- Click on the Edit Schedule option.
- Make the necessary changes in the Schedule Inspection form.
- Click on the Schedule button when finished.
Comments
0 comments
Please sign in to leave a comment.